NEW QUESTION # 20
Which two statements are true about Production Scheduling? (Choose two.)

  • A. Releasing a schedule can update Manufacturing Cloud work orders with revised dates, resources, release status, and work definitions.
  • B. If a work order is not firm. Production Scheduling may schedule with an alternate resource.
  • C. A resource's constraint mode has two choices: Relaxed and Constrained.
  • D. Schedule options include: Configure Scope. Parameters, and View Settings.
  • E. Refreshing a Production Schedule means that the schedule is being recalculated.

Answer: B,D


NEW QUESTION # 21
Your client uses product categories and global sourcing rules for supply planning. However, their newest product doesn't follow these rules. For a specific item in the category, it needs to be sourced from a different supplier globally.
How should they set this up for the easiest maintenance, going forward?

  • A. Create a new local sourcing rule for the item; assign it to the assignment set at the item level; leave the category as is for the remainder of the products.
  • B. Create a new global sourcing rule for the item; assign it to the assignment set at the item level; leave the category as is for the remainder of the products.
  • C. Create a new global sourcing rule for the item; assign it to the assignment set at the item-organization level; alter the category to be category-organization for the remainder of the products.
  • D. Create a new global sourcing rule for the item; assign it to the assignment set at the item-organization level; leave the category as is for the remainder of the products.
  • E. Create a new global sourcing rule for the item; remove the category level assignments and create new item level assignments for all items in the category pointing each to the correct global sourcing rule.

Answer: B


NEW QUESTION # 22
A supply plan has just been run that contains a configured item. You notice that the sourcing rules of the base model were used instead of sourcing rules for the configured item. Why did this happen?

  • A. No planning percentages were defined at the operation level within the work definition.
  • B. No sourcing rules have been defined for the configured item.
  • C. The sourcing rules of the base model had a priority of 1, while the sourcing rules of the configured item had a priority of 2.
  • D. The sourcing rules of the base model overrode the sourcing rules of the configured item.
  • E. It is not possible to create sourcing rules for the configured item; all configured items always use the same sourcing rules as the base model.

Answer: B


NEW QUESTION # 23
You are running a demand plan for the first time and you want to generate forecast for the next six months. Which two demand plans run options should be selected? (Choose two.)

  • A. Select sales orders as forecast profile.
  • B. Under data refresh options, select "Refresh with selected current data" and chose sales orders.
  • C. Select forecast shipments as forecast profiles.
  • D. Under data refresh options, select "Refresh with demand planning data."
  • E. Under data refresh options, select "Refresh with current data."

Answer: A,E


NEW QUESTION # 24
You ran a demand plan with the data refresh option "Do not refresh with current data." Identify two true statements. (Choose two.)

  • A. Shipments history data will be updated.
  • B. Forecasting engine will run without advancing the plan date.
  • C. Forecasting engine will not run.
  • D. Shipments forecast data will not be modified.
  • E. Shipments history data will not be modified.

Answer: B,E


NEW QUESTION # 25
You have created several infotiles based on the client requirements. You now want to group them together for display. How do you accomplish this?

  • A. First build them into a planning measure in Manage Planning Measures. Then open the planning measure on the plan by going to Open (choose area) > Choose planning measure.
  • B. First build them into a planning group in Manage Planning Groups. Then open the planning group on the plan by going to Open (choose area) > Choose planning group.
  • C. First build them into a tile set in Manage Table, Graphs, and Analysis Sets. Then open the tile set on the plan by going to Open (choose area) > Choose tile set.
  • D. First build them into an info set in Manage Infosets. Then open the info set on the plan by going to Open (choose area) > Choose info set.
  • E. No need to group them. Open them directly on the plan going to Open (choose area) > Choose Infotile.

Answer: C


NEW QUESTION # 26
Which option outlines changes you can make to a simulation plan when evaluating demand and supply?

  • A. Change item specification values, change item lead times, create mass changes for items all at once, change item-organization specification values
  • B. Change item specification values, change item lead times, create mass changes for items
  • C. Add demands, cancel demands, reschedule demands, add supply, cancel supply, reschedule supplies
  • D. Change item specification values, change item lead times, change item-organization specification values
  • E. Add demands, cancel demands, reschedule demands, add new planned orders, reschedule supplies

Answer: C


NEW QUESTION # 27
Which three statements are true regarding Managing Units of Measure? (Choose three.)

  • A. A unit of measure standard conversion specifies the conversion factor by which the unit of measure is equivalent to the unit of measure class.
  • B. You must define a unit of measure class with a base unit of measure.
  • C. If you want to transact items in units of measure that belong to classes other than their primary UOM class, you must also define conversions between the base units of measure of the different UOM classes.
  • D. A unit of measure conversion is a mathematical relationship between two different units of measure.
  • E. Non-standard, intraclass conversion rates can't be item specific.

Answer: B,C,D


NEW QUESTION # 28
Which feature is NOT available for Sales and Operations Planning plans?

  • A. Load Planning Data from Files
  • B. Collect Planning Data
  • C. Configure Exceptions
  • D. View Segmentation Summary

Answer: C


NEW QUESTION # 29
Demand is high leading up to the Christmas holiday every year between Dec 20 and Dec 24 and not on Christmas day (Dec 25). Your customer has two demand plans. Describe the steps to model Christmas causal factor in both demand plans.

  • A. Open a demand plan and edit Christmas casual factor measure. Place value of one from Dec 20 to Dec 24 and zero for non-impacted days including Dec 25. Causal factor changes in this demand plan will reflect in the 2nd demand plan also.
  • B. Open a demand plan and add a new customer specific Christmas causal factor. Create a table displaying the causal factor measure and relevant time period and modify as required. Causal factor changes are plan specific, so repeat the steps in the 2nd demand plan.
  • C. Open a demand plan and add a new customer specific Christmas causal factor. Create a table displaying the causal factor measure and relevant time period and modify as required. Causal factor changes in this demand plan will reflect in the 2nd demand plan also.
  • D. Use FBDI to create a new customer specific Christmas causal factor. Place value of 1 from Dec 20 to Dec 24. Causal factor changes are plan specific, so repeat the steps in the 2nd demand plan.
  • E. Use FBDI to create a new customer specific Christmas causal factor. Place value of 1 from Dec 20 to Dec 34. Causal factor upload to one demand plan will reflect in the 2nd demand plan also.
  • F. Open a demand plan and edit Christmas casual factor measure. Place value of one from Dec 20 to Dec 24 and zero for non-impacted days including Dec 25. Causal factor changes are plan specific, so repeat the steps in the 2nd demand plan.

Answer: C

Explanation:
Reference:


NEW QUESTION # 30
Your client has a requirement to restrict Supply Plan data access. Identify three Data Access Set detail entities that can be used to restrict plan data access. (Choose three.)

  • A. Demand Class
  • B. Customer
  • C. Item
  • D. Supplier
  • E. Material Planner
  • F. Transaction Type

Answer: B,C,D

Explanation:


NEW QUESTION # 31
Your client wants to exclude all of the inventory from the 'Reject' subinventory from only one of their supply plans. What action must be taken to meet this requirement?

  • A. Manage Plans > Search and select supply plans > 'Organizations and Schedules' tab > 'Organizations' > 'Subinventory Netting' > Deselect 'Reject' subinventory for each organization
  • B. Manage Subinventories > Choose a material status in which 'Nettable' is unchecked
  • C. Manage Subinventories > Search and select subinventory > Deselect 'Nettable'
  • D. Manage Plans > Search and select supply plans > 'Organizations and Schedules' tab > 'Supply Schedules' > 'Subinventory Netting' > Deselect 'Reject' subinventory for each organization
  • E. It is not possible to exclude one subinventory from a particular supply plan.

Answer: A


NEW QUESTION # 32
Which KPIs are available to measure forecasting accuracy and specify how these measures aggregated from item-organization level to higher levels.

  • A. MAPE, MAD, and Bias are used to measure forecast accuracy. MAD and Bias are aggregated using sum. MAPE is aggregated using weighted average.
  • B. MAPE, MFE, and Bias are used to measure forecast accuracy. MAPE and MFE are aggregated using weighted average. Bias is aggregated using sum.
  • C. MAPE, MAD, and Bias are used to measure forecast accuracy. MAPE and Bias are aggregated using weighted average. MAD is aggregated using sum.
  • D. MAPE, MFE, and Bias are used to measure forecast accuracy. MAPE and Bias are aggregated using weighted average. MFE is aggregated using sum.

Answer: A


NEW QUESTION # 33
Which two statements are true when using Measure catalogs? (Choose two.)

  • A. You navigate to Configure Measure Catalogs to edit the Catalog.
  • B. Measure catalogs are defined in the system to improve the performance of the plan.
  • C. You can restrict access to Measure Catalogs using Administer Data Security.
  • D. You can add or remove measures from a measure catalog.
  • E. The measure catalog has a collection of measures that you can enable for use in a single plan in the Planning Central work area.
  • F. The predefined measure catalog is not the system default.

Answer: D,E

Explanation:


NEW QUESTION # 34
Where do you view the collected data for Organizations, Customers, Suppliers, Carriers, and Interlocation Shipping Networks?

  • A. Review Plan Inputs
  • B. Planning Analytics
  • C. View Simulation Sets
  • D. Maintain Supply Network Model
  • E. View Collected Data

Answer: D


NEW QUESTION # 35
......