2022 Latest 100% Exam Passing Ratio - HPE6-A80 Dumps PDF
Pass Exam With Full Sureness - HPE6-A80 Dumps with 62 Questions
NEW QUESTION 15
A customer has a large network, which includes a main site and many branch sites. The network has a total of about 10.000 wireless devices at the main site and 15,000 wireless devices total at branches.
To fulfill the requirements for a wireless network upgrade, the architect plans to propose;
* 2 7205 MCs at the main site
* 2 7210 MCs at the main site
* 10 7030 MCs at branch sites
* 200 RAPs at branch sites
* 500 CAPS at the main site
* 300 CAPS at branch sites
What is the most cost-effective Mobility Master solution that meets the requirements'?
- A. MM-HW-5K appliance + MM-HW-5k appliance
- B. MM-HW-5K appliance
- C. MM-HW-1K appliance
- D. MM-HW-1OK appliance
Answer: A
NEW QUESTION 16
Refer to the exhibit.
This warehouse has the dimensions shown in the exhibit. The warehouse is 20 feet (6 m) high up to a steel railing on the celling. The shelves are about 16 feet (5m) high, and they hold large containers filled with fluid and metal equipment.
The customer needs consistent wireless coverage throughout the warehouse, mostly to support the tablets that employees use to run Inventory tracking and other applications. The warehouse staff works in shifts of 20.
The architect has selected AP-515S. About how many APs should the architect propose?
- A. about 23-32
- B. about 6-8
- C. about 13-16
- D. about 6-4
Answer: B
NEW QUESTION 17
A network architect plans to propose a virtual Mobility Master (VMM) tor a new solution. The solution will support up to 4.800 wireless client devices and include:
* two Virtual Mobility controllers (VMCs) in a cluster
* 180 APs
Which licenses should the architect propose?
- A. 1 MM-VA-500; 1 MC-VA-250; 180 Enterprise licenses
- B. 1 MM-VA-1K; 2 MC-VA-25Q; one Enterprise license
- C. 1 MM-VA-IK:I MC-VA-250; 180 Enterprise licenses
- D. 1 MM-VA-500; 2 MC-VA-250; 540 Enterprise licenses
Answer: C
NEW QUESTION 18
A hospital needs a Getter way to track its inventory Including wireless medical devices that are moved around the site a lot.
Which solution meets these needs?
- A. Aruba beacons and Meridian
- B. Aruba beacons. APs. and AirWave
- C. Aruba asset tags, APs; and Meridian
- D. Aruba asset tags and beacons
Answer: A
NEW QUESTION 19
What is one reason to deploy an Aruba CX switch when compared to an ArubaOS switch?
- A. to support Zero Touch provisioning (ZTP)
- B. to obtain API-enabled programmability for greater automation
- C. to obtain higher wattage power modules for enhanced PoE+ support
- D. to support Aruba Dynamic Segmentation
Answer: C
NEW QUESTION 20
Refer to the exhibit.

A customer needs to support resilient wireless services
What is one way that this design helps to minimize me impact of a railed access layer switch on these services?
- A. Each access layer switch has two redundant links to the core.
- B. The 8400s and G405s use Virtual Switching Extension (VSX) in cone and access.
- C. The switches support Smart Rate and dual home AP connections.
- D. APS in the same area connect to different switches.
Answer: C
NEW QUESTION 21
Match each hospital room with a potential issue for the AP design (Each match will be used once. )
Answer:
Explanation:
NEW QUESTION 22
A company has several remote sues that operate more or less autonomously. Each site has ns own local services and Internet connection However the company does have a main office with a few centralized resources that the company would like to make available to remote office employees over the Internet connection. Sites range in size and require between 10 and 20 APs.
The customer requires the most cost-effective solution that meets the requirements.
Which solution should the architect recommend for each remote site?
- A. an IAP cluster with an IPsec tunnel to a main office MC
- B. Campus APs (CAPs) with a local MC that has an SD-WAN license
- C. Remote APs (RAPs) with IPsec tunnels to a main office MC
- D. Campus APs (CAPS) with CPSec control channels to a main office MC
Answer: B
NEW QUESTION 23
A customer has multiple medium and large branch sites, eacri of which requires between S ana 16 APs and supports between 200 and 600 wireless clients, Every branch site has an Internet connection, which it uses to reach the central data center. The customer would prefer the WAN links to be optimized in the solution.
Different use cases require SSID's for tunneled traffic from remote sites to central location, traffic that must remain local on the remote site, and traffic which would need to egress out from remote site Internet connection.
Which branch office solution best meets the customer needs?
- A. RAPs and branch office controllers
- B. IAPs with branch office controllers
- C. lAPs with Aruba central
- D. CAPS and branch office controllers
Answer: C
NEW QUESTION 24
A retail customer is doing a wired and a wireless refresh with Arut>a CX switches and S02.11ax APs. Currently, trey nave wireless Point of Sales (PoS) systems and would like to assure that the proposed deployment solution will comply with the Payment Card Industry (PCI) Data Security Standard (DSS) requirements.
The architect have proposed the following deployment solutions regarding PCI DSS requirements'
-IDS/IPS
-Aruba APs in hybrid mode as well as in dedicated AMs mode
-Strong authentication and encryption for wireless
-Built-in firewall and role-based access controls to segment WLAN
Which other requirements must you include in the existing deployment solution? (Select two.)
- A. Select the FIPS/TAA-compliant version for the Access Points.
- B. Role-based access controls for wired users using ClearPass. Optionally ; tunneled-node to MCs.
- C. Suggest MACSet between the Aruba CX switches that encrypt all traffic over the link.
- D. Aruba Central or Aruba AirWave to generate a scheduled compliance reporting.
- E. Switch high-availability solution VSF and VSX also can encrypt all traffic on their switch links.
Answer: B,D
NEW QUESTION 25
Refer to the exhibit.
A museum wants to add full S02.11ax wireless coverage across the building, which is about 210 feet (64 m) by 330 feet (100 m). The museum has 15-foot (4.6 m) ceilings and stone interior walls. The network needs to support up to 600 wireless guest devices The exhibit also shows a preliminary plan tor AP locations, me museum has eight Ethernet drops in the lobby and girt stop, but has otherwise not been wired.
What is one recommendation that the architect should make to ensure a successful deployment?
- A. Add a wiring closet closer to the north side.
- B. Add about 10 APs to achieve adequate density
- C. Use directional antennas to avoid lost signal.
- D. Use at least CATS cable to connect to the APs.
Answer: A
NEW QUESTION 26
A mall requires a wireless network upgrade to 802 -Max The company that owns the mall wants to provide the APs for the entire mall. However, several of the larger national chain retailers with spaces in the mall want to offer wireless services with their own SSIDs.
These individual retailers also have their own wireless guest services and wireless client devices They have their own corporate infrastructure and want to handle all of this wireless traffic on their own, including terminating the traffic on their own controllers. The mall requires redundancy for its services, out the retailers do not.
Which plan for mobility controllers (MCs) and mobility master (MW) meets the needs of this scenario?
- A. two MCs for the mall company and one MC for each retailer with its own SSIDs, all controlled by the same pair of MMs
- B. two MCs for the mall company and for all of the retailers, both controlled by the same pair of MMs
- C. a pair of MMs for the mall company, but not MCs: MMs control one MC for each retailer with its own SSIDs
- D. two MCs for the mail company controlled by a pair of MMS; one standalone MC for each retailer with its own SSIDS
Answer: C
NEW QUESTION 27
What is one piece of additional information architects should obtain from the customer before they design the wireless solution?
- A. the authentication and encryption capabilities for loT devices and security cameras
- B. the power requirements for the wireless loT devices and security cameras
- C. the average number of users per loT device
- D. the distance between the locations where cameras will be installed and the wiring closet on each floor
Answer: D
NEW QUESTION 28
Refer to the exhibit.
Exhibit: A49.01114316-102
The architect has determined that this building requires two 10GPE links to the data center.
What is the correct transceiver type for the links?
- A. SFP+ SR
- B. SFP+ LRM
- C. SFP+ LR
- D. 3FP+ LRM with mode conditioning
Answer: B
NEW QUESTION 29
Refer to the exhibit.
A stadium wants to deploy location-based services, including blue-dot wayfinding over a 200.000 square root (isr580 sq. m) are a. The custom past particular areas. The customer has selected a 1 year subscription.
The exhibit shows the BOM that the architect created in iris.
Which correction should the architect make?
- A. Remove one Blue Dot Nav subscription.
- B. Change the campaign subscription to a Maps subscription.
- C. Add two Maps subscriptions.
- D. Add another campaign subscription.
Answer: B
NEW QUESTION 30
Refer to the exhibit.


A customer needs a wired network upgrade and has complained about performance issues. The architect collected information about traffic now on several switch ports in different locations across the network, and the results are shown in the exhibit. Each of these ports is a 1Gbps port.
What can the architect conclude?
- A. Port 1 shows periods of congestion; other ports are not congested.
- B. None of these ports show any periods of congestion
- C. All of the ports show serious congestion
- D. Port 3 snows periods of congestion; other ports are not congested.
Answer: B
NEW QUESTION 31
......
Verified HPE6-A80 dumps Q&As - 100% Pass from Test4Engine: https://www.test4engine.com/HPE6-A80_exam-latest-braindumps.html
Pass HPE6-A80 Exam in First Attempt Guaranteed 2022 Dumps: https://drive.google.com/open?id=1NQonT9MPa-zXtAcuugrvEBQnN2TieXAR