NEW QUESTION # 30
You want to create a production order. What methods can you use?
Note: There are 2 correct answers to this question.
- A. Convert a purchase requisition
- B. Create in Kanban process
- C. Create without material
- D. Create by order release
Answer: B,C
NEW QUESTION # 31
Which standard item categories can you select inside a bill of material (BOM)?
Note: There are 2 correct answers to this question
- A. Work item
- B. Variable-size item
- C. WBS item
- D. Non-stock item
Answer: B,D
Explanation:
You can select the following standard item categories inside a bill of material (BOM):
Variable-size item: This item category is used for materials that have variable dimensions, such as pipes, wires, or fabrics. The system calculates the quantity of the variable-size item based on the formula and the dimensions entered in the BOM. You can also use the variable-size item to define a scrap percentage for the material.
Non-stock item: This item category is used for materials that are not managed in inventory, such as consumables, services, or subcontracting items. The system does not create any reservations or stock movements for the non-stock item. You can use the non-stock item to trigger purchasing requisitions or purchase orders for the material. Reference: Bill of Material Item Category; Bills of Material in Production Planning
NEW QUESTION # 32
How are dependent requirements for assemblies created? Note: There are 2 correct answers to this question.
- A. They are created together with the independent requirement for the finished product.
- B. They are only created for multilevel bill of material (BOM) structures.
- C. They are created with exact times in Advanced Planning.
- D. They are created on assembly level during the planning run.
Answer: C,D
NEW QUESTION # 33
Your production planners must execute planning only for specific resources. How can you achieve this in Advanced Planning (PP/DS)?
- A. Use a planning group.
- B. Use a resource group
- C. Use a planning area.
- D. Use a propagation range.
Answer: B
Explanation:
You can achieve planning only for specific resources in Advanced Planning (PP/DS) by using a resource group. A resource group is a collection of resources that share the same characteristics and can be used interchangeably for production. You can assign a resource group to a product or a production version, and then use the resource group as a selection criterion in the planning board or the product view. This way, you can restrict the planning to only those resources that belong to the resource group. Reference: SAP S/4HANA Manufacturing for Planning & Scheduling - Implementation Guide, page 25; [SAP S/4HANA Production Planning and Manufacturing Certification Guide], page 79.
NEW QUESTION # 34
You want to insert an operation at a certain time on a work center in the graphical planning table. The planning direction is forward. The desired dispatching time coincides with an operation that has previously been dispatched.
How does the insertion take place?
- A. The new operation is inserted at the desired time; the previously dispatched operation is moved backward.
- B. The previously dispatched operation stays as is; the new operation is inserted before the dispatched operation.
- C. The new operation is inserted at the desired time; the previously dispatched operation is moved forward.
- D. The previously dispatched operation stays as is; the new operation is inserted after the dispatched operation.
Answer: A
NEW QUESTION # 35
Which time elements are relevant for lead time scheduling of a production order?
Note: There are 2 correct answers to this question.
- A. Setup time
- B. Total replenishment lead time
- C. Float after production
- D. Opening period
Answer: A,C
NEW QUESTION # 36
Where do you maintain data to determine the duration of an operation for production? Note: There are 2 correct answers to this question.
- A. Bill of material (BOM)
- B. Work Center
- C. Routing
- D. Material Master
Answer: B,C
Explanation:
The duration of an operation for production is determined by the combination of data maintained in the routing and the work center. The routing defines the sequence of operations, the work centers, and the standard values for each operation, such as setup time, processing time, and teardown time. The work center defines the capacity, the formulas, and the scheduling parameters for each operation, such as base quantity, operation rate, and queue time. The system calculates the duration of an operation by multiplying the standard values from the routing by the factors from the work center formulas and adding the scheduling parameters from the work center. For example, if the routing specifies a processing time of 10 minutes per unit and the work center formula is processing time = (processing time / base quantity) * operation quantity, and the base quantity is 100 units, then the duration of the operation for 50 units is (10 / 100) * 50 = 5 minutes.
The bill of material (BOM) (C) and the material master (D) are not data objects that determine the duration of an operation for production. The BOM defines the components and the quantities that are required for producing a material. The material master defines the general and specific attributes of a material, such as the material type, the unit of measure, the MRP data, and the production data. These data objects are relevant for planning the material requirements and the production costs, but not the operation duration. Reference:
https://help.sap.com/docs/SAP_S4HANA_ON-PREMISE/c00ad2cac7be4ef29a4461ba114e4f91/051ebf53d25ab64ce10000000a174cb4.html
https://learning.sap.com/learning-journeys/manage-production-orders-in-sap-s-4hana-manufacturing/scheduling-production-orders_cc390d5f-b87c-4c4d-9472-8bb10ea4f476
NEW QUESTION # 37
Where do you maintain the work center that represents the production line for repetitive manufacturing? Note: There are 2 correct answers to this question.
- A. Repetitive manufacturing profile
- B. Production cost collector
- C. Production version
- D. Routing
Answer: C,D
NEW QUESTION # 38
For production orders cost object controlling (COC) can be carried out on an order related or product related basis. Which of the following do you have to consider?
Note: There are 2 correct answers to this question.
- A. Productrelated COC is used in manufacturing for coproducts.
- B. In productrelated COC all costs are debited credited to a product cost collector.
- C. Orderrelated COC is beneficial in a flexible production environment.
- D. In orderrelated COC individual production orders do NOT have cost segments.
Answer: B,C
NEW QUESTION # 39
What information do you have to maintain to define the relationship between supply source dem source in the Kanban process? Note: There are 2 correct answers to this question.
- A. Replenishment strategy
- B. Work Center
- C. Routing
- D. Production supply area
Answer: A,D
NEW QUESTION # 40
How can a material availability check be triggered automatically for a production order? Note: There are
2 correct answers to this question.
- A. By order confirmation
- B. By mass processing
- C. By capacity planning
- D. By order release
Answer: B,D
NEW QUESTION # 41
Your company produces a finished good based on a forecast and expects it to be in stock when customers order it. If customers order more than the forecasted quantity, this must NOT have any impact on the production program. Which planning strategy do you use?
- A. Make-to-stock production (20)
- B. Planning without final assembly (50)
- C. Planning with final assembly (40)
- D. Make-to-stock production (10)
Answer: D
Explanation:
Make-to-stock production (10) is a planning strategy that supports the production of a finished good based on a forecast and without any reference to sales orders. This strategy is used when the finished good has a stable and predictable demand, and the company wants to maintain a certain level of safety stock to meet customer orders. If customers order more than the forecasted quantity, this does not affect the production program, as the system does not generate any additional planned orders or purchase requisitions for the finished good. Instead, the system reduces the planned independent requirements by the sales order quantity, and the excess demand is covered by the safety stock or the available stock. This strategy allows for a smooth and continuous production process, and avoids frequent changes in the production plan. Reference: Make-to-Stock Production | SAP Help Portal, Planning Strategies | SAP Help Portal, SAP S/4HANA Production Planning and Manufacturing Certification Guide, page 52.
NEW QUESTION # 42
Which options do you have to plan both quantities capacities during line loading in repetitive manufacturing? Note: There are 2 correct answers to this question.
- A. Assign planned orders manually in the planning table.
- B. Run MRP with quota arrangement.
- C. Run MRP with automatic selection of production version.
- D. Run PP/DS heuristics for repetitive manufacturing.
Answer: B,D
NEW QUESTION # 43
How can you set up a material as a phantom assembly?
Note: There are 2 correct answers to this question
- A. Define the special procurement type inside the BOM
- B. Change the item category of the phantom assembly in the bill of material *-' (BOM)
- C. Define the special procurement type inside the material master.
- D. Change the phantom item indicator for the phantom assembly in the bill of material (BOM)
Answer: C,D
Explanation:
A phantom assembly is a material that is not physically produced, but its components are directly consumed in the production of a higher-level material. To set up a material as a phantom assembly, you need to do the following steps:
Define the special procurement type as 50 (phantom assembly) in the material master of the phantom assembly. This indicates that the material is not procured or produced, but its components are exploded in the BOM of the higher-level material.
Change the item category of the phantom assembly in the BOM of the higher-level material to N (phantom item). This indicates that the phantom assembly is not relevant for production order or MRP, but its components are.
Alternatively, you can change the phantom item indicator for the phantom assembly in the BOM of the higher-level material to X (phantom assembly). This has the same effect as changing the item category to N, but it also allows you to use the same BOM for different purposes, such as costing or sales. Reference: [SAP S/4HANA Production Planning and Manufacturing Certification Guide], page 68; [SAP Help Portal: Phantom Assembly].
NEW QUESTION # 44
During production order creation several valid production versions are found. How does the system choose the production version?
- A. Validity period or sales order
- B. Planned order or material number
- C. Alphanumeric or quota arrangement
- D. Lot size or material cost
Answer: C
NEW QUESTION # 45
Your quality department detects a deviation in a raw material batch. Unfortunately this batch has already been used in production. How can you identify all affected finished goods stocks?
Note: There are 2 correct answers to this question.
- A. Use the batch whereused list.
- B. Use batch derivation.
- C. Use batch determination.
- D. Use the Batch Information Cockpit.
Answer: A,D
NEW QUESTION # 46
For a production version to be valid and consistent, what requirements must be fulfilled? Note: There are 3 correct answers to this question.
- A. The assigned routing must be a rate routing.
- B. The lot size range must be within the lot size range of the assigned routing.
- C. The assigned routing must NOT have alternative sequences
- D. The deletion flag must NOT be set for the bill of material (BOM) or the routing
- E. The assigned routing and bill of material (BOM) must be valid in the entirevalidity period.
Answer: B,D,E
Explanation:
A production version is a combination of a BOM and a routing that defines how a material is produced. For a production version to be valid and consistent, the following requirements must be fulfilled:
The deletion flag must NOT be set for the BOM or the routing. The deletion flag indicates that the BOM or the routing is no longer used and should be archived. If the deletion flag is set, the production version cannot be used for production planning or execution.
The lot size range must be within the lot size range of the assigned routing. The lot size range specifies the minimum and maximum order quantity for which the production version is valid. The lot size range of the production version must match or be smaller than the lot size range of the routing, otherwise the system will not find a suitable routing for the production order.
The assigned routing and BOM must be valid in the entire validity period. The validity period defines the time frame for which the production version is valid. The validity period of the production version must be within or equal to the validity periods of the routing and the BOM, otherwise the system will not find a consistent BOM and routing combination for the production order. Reference: [SAP S/4HANA Production Planning and Manufacturing Certification Guide], page 113; [SAP Help Portal: Production Version].
NEW QUESTION # 47
......