[Nov 28, 2021] C-TS422-2020 PDF Questions and Testing Engine With 82 Questions [Q38-Q53]

Share

[Nov 28, 2021] C-TS422-2020 PDF Questions and Testing Engine With 82 Questions

Updated Exam Engine for C-TS422-2020 Exam Free Demo & 365 Day Updates

NEW QUESTION 38
An issue storage location was NOT found through the work center, bill of material (BOM)item, or material master. Whatdetermines whether the storage location can be derived from the production version?

  • A. MRP Profile
  • B. MRP Controller
  • C. MRP Group
  • D. Plant Data

Answer: C

 

NEW QUESTION 39
In which data objects do you maintain the production line as the work center forrepetitive manufacturing?
Note: There are 2 correct answers to this question.

  • A. Repetitive manufacturing profile
  • B. Routing
  • C. Production version
  • D. Production cost collector

Answer: B,C

 

NEW QUESTION 40
In your plant, MRP is activated. Which options do you have to exclude a material from the MRP run?Note:
There are 2 correct answers to this question.

  • A. Use a specific material group
  • B. Use a specific MRP type.
  • C. Use a specific material status.
  • D. Use a specific MRP controller.

Answer: B,D

 

NEW QUESTION 41
What determines whether the planned independent requirements in MRP consume other requirements?

  • A. Requirements profile
  • B. Order type
  • C. Consumption sequence procedure
  • D. Requirements type

Answer: D

 

NEW QUESTION 42
You want to insert an operation at a certain time on a work center. The planning direction is forward. The desired dispatching time coincides with an operation that has previously been dispatched. How does the insertion take place?

  • A. The new operation is inserted at the desired time; the previously dispatched operation is moved forward.
  • B. The new operation is inserted at the desired time the previously dispatched operation is moved backward.
  • C. The previously dispatched operation stays as is the new operation is insertedafter the dispatched operation.
  • D. The previously dispatched operation stays assist the new operation is inserted before the dispatched operation.

Answer: B

 

NEW QUESTION 43
MRP created a planned order for a material that has one single material from stock as a component. What happens to this dependent requirement when you convert the planned order into a production order?

  • A. It is converted into a reservation.
  • B. It is converted into a schedule line.
  • C. It is converted into a planned order.
  • D. It is converted into a production order.

Answer: A

 

NEW QUESTION 44
Which time elements can be reduced by a reductionstrategy? Note: There are 3 correct answers to this question.

  • A. Float after production
  • B. Wait time
  • C. Move time
  • D. Goods receipt processing time
  • E. Queue time

Answer: A,C,E

 

NEW QUESTION 45
How can you carry out cost object controlling for production orders? Note: There are 2 correct answers to this question.

  • A. Product-related
  • B. Milestone-related
  • C. Order-related
  • D. Cost-related

Answer: A,C

 

NEW QUESTION 46
Which time elements are part of a routing operation? Note: There are 3 correct answers to this question.

  • A. Move time
  • B. Wait time
  • C. Float before production
  • D. Pick/pack time
  • E. Queue time

Answer: B,D,E

 

NEW QUESTION 47
What are possible configuration steps when setting up the alert monitor in Advanced Planning? Note: There are 3 correct answers to this question.

  • A. Create object selection variant for product-related alerts.
  • B. Create object selection variant for transportation lane-related alerts.
  • C. Assign the overall profile to the authorization profile.
  • D. Create object selection variant for resource-related alerts
  • E. Assign the alert profile to the overall profile.

Answer: A,D,E

 

NEW QUESTION 48
What are the consequences if operation status Dispatched is set for a production order operation?

  • A. You can reschedule the order using lead time scheduling.
  • B. You canreschedule the order using material requirements planning.
  • C. You can reschedule the operation using finite Scheduling in a planning board.
  • D. You can reschedule the operation using lead the scheduling.

Answer: C

 

NEW QUESTION 49
Which materials have a negative quantity in a bill of materials or in a recipe? Note: There are 3 correct answers to this question.

  • A. Co-products
  • B. Waste products
  • C. Continuous flow materials
  • D. Bulk materials
  • E. By-products

Answer: A,B,E

 

NEW QUESTION 50
What is a work center hierarchy in SAP S/4HANA capacity planning?

  • A. A group of alternative work centers for production, structured in hierarchy levels by prior ties
  • B. A group of work centers in a production line beingused in sequence for production
  • C. A group of work centers in a parallel sequence that is used to split product on quantities and work on them in parallel
  • D. A group of alternative work centers providing a cumulative available capacity for production

Answer: D

 

NEW QUESTION 51
How can you limit the validity of a bill of material (BOM)? Note: There are 2 correct answers to this question.

  • A. By material type
  • B. By period
  • C. By industry
  • D. By plant

Answer: B,D

 

NEW QUESTION 52
You want to perform capacity availability checks on your production orders. What must be set for this to occur? Note: Thereare 2 correct answers to this question.

  • A. Checking control must have an overall profile assigned in customizing.
  • B. Checking rule and group must be assigned.
  • C. Indicator Relevant for finite scheduling must be set.
  • D. PRT Availability check must be set.

Answer: A,C

 

NEW QUESTION 53
......


SAP S/4HANA Production Planning and Manufacturing Certification Exam Topics:

Topic AreasTopic Details, Courses, BooksWeighting
Capacity Planning in SAP S/4HANAOutline best practices for using SAP S/4HANA, describe the SAP HANA database concept and new user experience with SAP Fiori, outline the capabilities of embedded analytics.

TS421, TS422 (SAP S/4HANA 2020)
OR
S4230 (SAP S/4HANA 2020)

8% - 12%
Production Orders in SAP S/4HANADetermine BOM item category, describe order status management and set user statuses, configure availability check for components, trigger routing selection, set up an order type, apply material staging and confirmation.

TS421, TS422 (SAP S/4HANA 2020)
OR
S4225 (SAP S/4HANA 2020)

> 12%
Master Data in SAP S/4HANAIdentify and explain production relevant master data, including, but not limited to: bill of material, routing and production version.

TS421, TS422 (SAP S/4HANA 2020)
OR
S4210 (SAP S/4HANA 2020)

> 12%
Advanced Planning in SAP S/4HANAOutline the basics and master data of advanced planning, explain tools (alert monitor, detailed scheduling planning board) and advanced planning and detailed scheduling processes, explain planning evaluation concepts

TS421, TS422 (SAP S/4HANA 2020)
OR
S4220 (SAP S/4HANA 2020)

> 12%
Introduction to SAP S/4HANA Supply Chain PlanningOutline both motivation and background of SAP S/4HANA, describe its main components, the lines of business, and the SAP User Experience strategy.

TS421, TS422 (SAP S/4HANA 2020)
OR
S4200 (SAP S/4HANA 2020)

< 8%
Demand Management in SAP S/4HANAExplain and compare the different production methods in make-to-order, make-to-stock, and assembly planning.

TS421, TS422 (SAP S/4HANA 2020)
OR
S4220 (SAP S/4HANA 2020)

< 8%
Introduction to SAP S/4HANA Production PlanningOutline production planning components and functions, differentiate consumption-based planning vs. MRP, outline new trends in production planning.

TS421, TS422 (SAP S/4HANA 2020)
OR
S4220 (SAP S/4HANA 2020)

< 8%
Lean Manufacturing in SAP S/4HANAIdentify repetitive manufacturing specific master data, explain line load planning and confirmation, outline Kanban master data and Kanban processes.

TS421, TS422 (SAP S/4HANA 2020)
OR
S4200 (SAP S/4HANA 2020)

8% - 12%
Process Orders in SAP S/4HANACharacterize process order elements and process order processing, determine master data objects for process orders, identify features for Good Manufacturing Practices (GMP).

TS421, TS422 (SAP S/4HANA 2020)
OR
S4200 (SAP S/4HANA 2020)

< 8%
Material Requirements Planning in SAP S/4HANASelect and apply planning strategies, use the planning table, characterize long-term planning and master production scheduling, outline MRP basics and steps of MRP, and describe lot size procedures.

TS421, TS422 (SAP S/4HANA 2020)
OR
S4220 (SAP S/4HANA 2020)

8% - 12%


SAP S/4HANA Production Planning and Manufacturing Certification Exam Details:

Reference BooksTS421, TS422 (SAP S/4HANA 2020)
TS421 (SAP S/4HANA 1909), TS422 (SAP S/4HANA 1909)
Exam NameSAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing
Exam Price$550 (USD)
Sample QuestionsSAP S/4HANA Production Planning and Manufacturing Certification Sample Questions
Exam CodeC_TS422_2020
Number of Questions80
Duration180 mins
LevelAssociate
Schedule ExamSAP Training
Passing ScoreC_TS422_2020 - 56%
C_TS422_1909 - 55%

 

Exam Passing Guarantee C-TS422-2020 Exam with Accurate Quastions: https://www.test4engine.com/C-TS422-2020_exam-latest-braindumps.html

Test Engine to Practice Test for C-TS422-2020 Valid and Updated Dumps: https://drive.google.com/open?id=1N5N6Oy2gVMwuJMV9PInvfH2OK0gdQIXk